Description

Location: Atlantis Resort and Casino

Contact: gsn@gsnv.org

GSN REGULAR MEMBERSHIP MEETING – Friday, January 16, 2026

TIME: Drinks @ 6 pm, Dinner @ 6:30 pm, Talk @ 7:15 pm

WHERE: ATLANTIS CASINO RESORT, RENO, NV, Grand Ballroom 5-7

DINNER COST:  $60 per person

ONLINE RESERVATIONS CAN BE MADE BELOW.

PLEASE RSVP FOR DINNER NO LATER THAN MONDAY, JAN. 12, 2026.

MEETING SPONSOR:  Premier Drilling

SPEAKER: Perseo Anaya, Orla Mining Ltd

TITLE: “South Carlin Complex Growth Trajectory Ahead of 2026 Construction”

ABSTRACT: Orla Mining Ltd. is progressing its initiatives at the Railroad, South Railroad, and Pony Creek Projects, situated within the extensive South Carlin Complex. Since the acquisition of GSV in 2022, the exploration programs have concentrated on converting mineral reserves and fostering project expansion through consistent investments in systematic drilling. This approach has yielded significant oxide intercepts beyond current pit designs and has advanced over 15 satellite targets, indicating potential for additional resource growth across the Company’s extensive landholdings in anticipation of production commencing in 2028.

The new Open Pit Oxide Mine in Nevada is currently in the final stages of permitting, with construction anticipated to commence in mid-2026 and initial production set for 2028. The mining plan involves the Pinion and Dark Star deposits, which together contain a total reserve of 1.6 million ounces (65.2 Mt at an average grade of 0.77 g/t Au), as documented in the 2022 Feasibility Study (an updated Feasibility Study is scheduled for release in the first quarter of 2026). The projected high-quality oxide growth will extend the mine life beyond the 10 years of planned production, which is supported by the latest results of the Pinion deposit extension (67.1 m at 1.06 g/t Au in hole PR25-05), the Dark Star deposit extension (22.6 m at 5.65 g/t Au in hole DS25-03), as well as other advancing targets such as Jasperoid Wash (13.7 m at 0.73 g/t Au and 18.3 m at 0.30 g/t Au in hole JW25-02), Bowl (18.3 m at 0.62 g/t Au in hole BW25-01), Pod-SH, and emerging targets like Firebox (24.4 m at 1.08 g/t Au in hole PR25-09) and Spike (38.1 m at 0.80 g/t Au in hole RR25-05).

The exploration campaign planned for 2026 is anticipated to extend the mine life, advance some satellite targets, and test innovative concepts to sustain a robust pipeline of near-surface oxide projects.

 

Please contact Laura Ruud or Lauren Sankovitch at the GSN office for more information:  gsn@gsnv.org


Details

01/16/2026 18:00:0001/16/2026 21:00:00America/Los_AngelesGSN Regular Membership Meeting – Friday, January 16, 2026

GSN REGULAR MEMBERSHIP MEETING - Friday, January 16, 2026

TIME: Drinks @ 6 pm, Dinner @ 6:30 pm, Talk @ 7:15 pm

WHERE: ATLANTIS CASINO RESORT, RENO, NV, Grand Ballroom 5-7

DINNER COST:  $60 per person

ONLINE RESERVATIONS CAN BE MADE BELOW.

PLEASE RSVP FOR DINNER NO LATER THAN MONDAY, JAN. 12, 2026.

MEETING SPONSOR:  Premier Drilling

SPEAKER: Perseo Anaya, Orla Mining Ltd

TITLE: "South Carlin Complex Growth Trajectory Ahead of 2026 Construction"

ABSTRACT: Orla Mining Ltd. is progressing its initiatives at the Railroad, South Railroad, and Pony Creek Projects, situated within the extensive South Carlin Complex. Since the acquisition of GSV in 2022, the exploration programs have concentrated on converting mineral reserves and fostering project expansion through consistent investments in systematic drilling. This approach has yielded significant oxide intercepts beyond current pit designs and has advanced over 15 satellite targets, indicating potential for additional resource growth across the Company’s extensive landholdings in anticipation of production commencing in 2028.

The new Open Pit Oxide Mine in Nevada is currently in the final stages of permitting, with construction anticipated to commence in mid-2026 and initial production set for 2028. The mining plan involves the Pinion and Dark Star deposits, which together contain a total reserve of 1.6 million ounces (65.2 Mt at an average grade of 0.77 g/t Au), as documented in the 2022 Feasibility Study (an updated Feasibility Study is scheduled for release in the first quarter of 2026). The projected high-quality oxide growth will extend the mine life beyond the 10 years of planned production, which is supported by the latest results of the Pinion deposit extension (67.1 m at 1.06 g/t Au in hole PR25-05), the Dark Star deposit extension (22.6 m at 5.65 g/t Au in hole DS25-03), as well as other advancing targets such as Jasperoid Wash (13.7 m at 0.73 g/t Au and 18.3 m at 0.30 g/t Au in hole JW25-02), Bowl (18.3 m at 0.62 g/t Au in hole BW25-01), Pod-SH, and emerging targets like Firebox (24.4 m at 1.08 g/t Au in hole PR25-09) and Spike (38.1 m at 0.80 g/t Au in hole RR25-05). The exploration campaign planned for 2026 is anticipated to extend the mine life, advance some satellite targets, and test innovative concepts to sustain a robust pipeline of near-surface oxide projects.  

Please contact Laura Ruud or Lauren Sankovitch at the GSN office for more information:  gsn@gsnv.org


[gravityform id="9" title="true" description="true"]
Reno, NV
Event StartsEvent Ends
01/16/202601/16/2026
All Day Event
6:00pm9:00pm